Big strides at Verilife Romeoville, IL Cordos has finished blocking in the bathrooms and kitchen areas, laying the foundation for bathroom accessories, cabinets, and countertops.

Previous
Previous

COROS is pushing forward with in-wall electrical conduit and junction boxes, along with the installation of ½” copper domestic water lines and PVC drains for split AC units at the IT & back rooms.

Next
Next

CORDOS has wrapped up underground plumbing, including thorough inspection and backfilling. for the next phase: we've installed dowels and a plastic vapor barrier for the upcoming concrete pour.